When do I need a refurbishment and demolition survey?
Before any work that will disturb the fabric of a pre-2000 building: refurbishment, upgrades, rewiring, removing walls or ceilings, replacing a roof, or demolition. HSE says work that could disturb hidden asbestos needs a more intrusive survey before it starts. It only needs to cover the areas being worked on.
Homes aren't covered by the duty to manage, but builders and contractors still need to know what they'll disturb, and many will ask for a survey before they price the job.
How is it different from a management survey?
It's intrusive. The surveyor may lift floorboards, open up walls and ceilings, and get into voids to find asbestos that a management survey wouldn't reach. That means the area usually needs to be empty, and some making good may be needed afterwards. For a demolition survey, the whole building is surveyed.
What happens if asbestos is found?
Anything that the work will disturb normally has to be removed before the work starts. The survey report tells you what it is and where, so a removal contractor can quote, and whether it needs a licensed contractor. Then the builders can start with a clear area.
Questions
Do I need a refurbishment survey for a kitchen refit?
If the house was built or refurbished before 2000 and the work will disturb walls, ceilings, floors or boxing-in, it's the safe way to start. The survey only needs to cover the area being worked on.
Can the builders start while waiting for results?
Not in the areas being surveyed. Any asbestos found that the work would disturb needs dealing with first.
Sources: HSE guidance on asbestos surveys and on refurbishment and demolition work. Checked 16 November 2026. This is general information, not legal advice.